scaffold access requirements
[, When scaffold platforms are more than 24 inches (61 cm) above or below a point of access, ladders, ramps, walkways, or similar surfaces must be used. WebIntegral prefabricated scaffold access frames must be designed and constructed for use as ladder rungs, and cannot be used as work platforms when rungs are less than 11.5 inches in COF employees receive annual training WebEach scaffolding access ladder section, whether 6ft or 3ft requires a ladder bracket. Supported scaffold poles, legs, posts, frames, and uprights shall bear on base plates and mud sills or other adequate firm foundation. Handrails, and toprails that are used as handrails, shall be at least 3 inches (7.6 cm) from other objects. [29 CFR 1926.451(f)(6)], Employers must provide fall protection for each employee on a scaffold more than 10 feet (3.1 m) above a lower level. [29 CFR 1926.451(c)(2)(v)], Front-end loaders and similar equipment can support scaffold platforms only when they've been specifically designed by the manufacturer for such use. type of scaffold (tube and fitting or system) maximum bay lengths. Web(1) When scaffold platforms are more than 2 feet (0.6 m) above or below a point of access, portable ladders, hook-on ladders, attachable ladders, stair towers (scaffold stairways/towers), stairway-type ladders (such as ladder stands), ramps, walkways, integral prefabricated scaffold access, or direct access from another scaffold, structure, Severe Storm and Flood Recovery Assistance, Personal fall-arrest system, or a guardrail system, or a inch (1.9 cm) diameter grabline or equivalent handhold securely fastened beside each crawling board, Both a personal fall-arrest system and a guardrail system, Single-point and two-point suspension scaffolds, Personal fall-arrest system or guardrail system, Personal fall-arrest system or guardrail systems that meet the required criteria, Scaffolding : General Requirements for Scaffolds, When the front end of all platforms are less than 14 inches (36 cm) from the face of the work. May forklifts, front-end loaders, or similar equipment support platforms? Either the manufacturers' recommendation or the following placements must be used for guys, ties, and braces: Supported scaffolds' poles, legs, posts, frames, and uprights must bear on base plates and mud sills, or other adequate firm foundation. Must have a minimum rung length of 11 inches, and a maximum space between rungs of 16 inches. Scaffold planking must be able to support, without failure, its own weight and at least four times the intended load. Scaffolds must be equipped with proper access and may include dual access as necessary. [29 CFR 1926.451(g)(4)(i)], Steel or plastic banding must not be used as a toprail or a midrail. [, All suspension scaffolds must be tied or otherwise secured to prevent them from swaying, as determined by a competent person. When used on a supported scaffold more than 35 feet high, must have rest platforms at 35-foot maximum intervals. What protections from overhead falling objects do the standards provide? When an outrigger beam is used, the shackle or clevis with which the rope is attached to the outrigger beam shall be placed directly over the center line of the stirrup. Employers are required to provide fall protection for employees erecting or dismantling supported scaffolds where the installation and use of such protection is feasible and does not create a greater hazard. The load end of wire suspension ropes shall be equipped with proper size thimbles and secured by eyesplicing or equivalent means. Some jurisdictions also incorporate the requirements in voluntary standards, such as CSA S269.2-M87 Access Scaffolds and scaffold components shall be inspected for visible defects by a competent person before each work shift, and after any occurrence which could affect a scaffold's structural integrity. Must have uniform tread depth, within inch, for each flight of stairs. Each stairway must be at least 18 inches between stair rails. Wood platforms shall not be covered with opaque finishes, except that platform edges may be covered or marked for identification. WebRequirements for Scaffolding Tower Use of Safety Harness Safe place and Safe person strategy You can read regulation of Trakhees, in detail. [ 29 CFR 1926.451(a)(1) ] A qualified person must design the scaffolds, which are loaded in Must have cleats, not more than 14 inches apart, securely fastened to the planks for footing if the slope is more than 1 vertical to 8 horizontal. Scaffolds are commonly used in construction work so workers have a safe, stable work platform when work cannot be done at ground level or on a finished floor. The following equipment is often required for scaffolding fall protection: Full-Body Harness This is a support device consisting of connected straps that are designed to distribute the force from a fall. Scaffolding Access Egress Requirements. Treads and landings shall have slip-resistant surfaces. When vertical lifelines are used, they shall be fastened to a fixed safe point of anchorage, shall be independent of the scaffold, and shall be protected from sharp edges and abrasion. [29 CFR 1926.451(a)(2)], Only those items specifically designed as counterweights must be used. [29 CFR 1926.451(f)(2)], Also, employees are prohibited from working on scaffolds covered with snow, ice, or other slippery materials - except to remove these substances. Outrigger beams shall be placed perpendicular to its bearing support (usually the face of the building or structure). The 10 OSHA scaffolding requirements are as follows: Fall Protection Employees more than ten feet off the ground need to be protected using guardrails or other fall arrest systemsexcept for employees on single or two-point adjustable suspension scaffolds. Where scaffolds must be used in areas that the employer can demonstrate are so narrow that platforms and walkways cannot be at least 18 inches (46 cm) wide, such platforms and walkways shall be as wide as feasible, and employees on those platforms and walkways shall be protected from fall hazards by the use of guardrails and/or personal fall arrest systems. 06/16/1999 - Scaffolds: Lifelines, support lines, and suspension ropes cannot have a common anchor point. Employees shall be prohibited from working on scaffolds covered with snow, ice, or other slippery material except as necessary for removal of such materials. Do employees working on supported scaffolds need to be trained? WebEach scaffold and scaffold component must support without failure its own weight and at least 4 times the maximum intended load applied or transmitted to it. Portable, hook-on, and attachable ladders (Additional requirements for the proper construction and use of portable ladders are contained in subpart X of this part -- Stairways and Ladders): Portable, hook-on, and attachable ladders shall be positioned so as not to tip the scaffold; Hook-on and attachable ladders shall be positioned so that their bottom rung is not more than 24 inches (61 cm) above the scaffold supporting level; When hook-on and attachable ladders are used on a supported scaffold more than 35 feet (10.7 m) high, they shall have rest platforms at 35-foot (10.7 m) maximum vertical intervals. Unstable objects shall not be used as working platforms. There is no minimum width requirement for boatswains' chairs. Tiebacks shall be equivalent in strength to the hoisting rope. the grounding conductor is not attached in series with the welding process or the work piece. Scaffolds are commonly used in construction work so workers have a safe, stable work The inboard ends of suspension scaffold outrigger beams shall be stabilized by bolts or other direct connections to the floor or roof deck, or they shall have their inboard ends stabilized by counterweights, except masons' multi-point adjustable suspension scaffold outrigger beams shall not be stabilized by counterweights. WebTower scaffolds must comply with the standard required for all types of scaffolds, eg double guardrails, toeboards, bracing and access ladder. Evidence that the secondary brake has been activated during an overspeed condition and has engaged the suspension rope. The stall load of any scaffold hoist shall not exceed 3 times its rated load. Scaffold Does a scaffold meet the requirements of 1926.502 (d) (15)? Hook-on or attachable ladders shall be installed as soon as scaffold erection has progressed to a point that permits safe installation and use. When can welding be done from a suspension scaffold? When midrails, screens, mesh, intermediate vertical members, solid panels, or equivalent structural members are used, they shall be installed between the top edge of the guardrail system and the scaffold platform. For example: A scaffold erected [29 CFR 1926.451(d)(15)], An automatic braking and locking device, in addition to the operating brake, must engage when a hoist makes instantaneous change in momentum or an accelerated overspeed. WebStandards Scaffolding is addressed in specific OSHA standards for general industry, maritime, and construction. Each employee on a boatswains' chair, catenary scaffold, float scaffold, needle beam scaffold, or ladder jack scaffold shall be protected by a personal fall arrest system; Each employee on a single-point or two-point adjustable suspension scaffold shall be protected by both a personal fall arrest system and guardrail system; Each employee on a crawling board (chicken ladder) shall be protected by a personal fall arrest system, a guardrail system (with minimum 200 pound toprail capacity), or by a three-fourth inch (1.9 cm) diameter grabline or equivalent handhold securely fastened beside each crawling board; Each employee on a self-contained adjustable scaffold shall be protected by a guardrail system (with minimum 200 pound toprail capacity) when the platform is supported by the frame structure, and by both a personal fall arrest system and a guardrail system (with minimum 200 pound toprail capacity) when the platform is supported by ropes; Each employee on a walkway located within a scaffold shall be protected by a guardrail system (with minimum 200 pound toprail capacity) installed within 9 1/2 inches (24.1 cm) of and along at least one side of the walkway. Must be at least 18 inches wide between stair-rails, and have a landing platform at least 18 inches wide by at least 18 inches long at each level. Independent support lines and suspension ropes shall not be attached to the same points of anchorage. Effective September 2, 1997, the employer shall have a competent person determine the feasibility and safety of providing fall protection for employees erecting or dismantling supported scaffolds. Hook-on and attachable ladders shall have uniformly spaced rungs with a maximum spacing between rungs of 16 3/4 inches. this Section and Section 24.B. Direct access to or from another surface shall only be used when the scaffold is not more than 14 inches horizontally and 24 inches vertically from the other surface. The scaffolding standard prohibits the [44 FR 8577, Feb. 9, 1979; 44 FR 20940, Apr. The space must not exceed 9 inches (24.1 cm) when side brackets or odd-shaped structures result in a wider opening between the platform and the uprights. platform boarding arrangement and the number of boarded lifts that Ladders shall not be used on scaffolds to increase the working level height of employees, except on large area scaffolds where employers have satisfied the following criteria: When the ladder is placed against a structure which is not a part of the scaffold, the scaffold shall be secured against the sideways thrust exerted by the ladder; The platform units shall be secured to the scaffold to prevent their movement; The ladder legs shall be on the same platform or other means shall be provided to stabilize the ladder against unequal platform deflection, and. When a guardrail system is used, the guardrail height must be increased in height equal to the height of the stilts. Climbing the structural cross-braces of a scaffold is unsafe, and specifically forbidden by federal standards. What are the requirements for suspension scaffolds? At all points of a scaffold where the platform changes direction, such as turning a corner, any platform that rests on a bearer at an angle other than a right angle shall be laid first, and platforms which rest at right angles over the same bearer shall be laid second, on top of the first platform. Provide scaffold platforms more than 2 feet (0.6 m) above or below a point of access with at least one of the following means of access: Portable, hook-on, or attachable ladder Stairway-type ladder Ladder stand Stair tower (scaffold stairway or tower) Ramp Walkway Integral prefabricated scaffold access [29 CFR 1926.451(c)(1)]. Steel or plastic banding shall not be used as a toprail or midrail. [29 CFR 1926.450(b)] They must be placed perpendicular to their bearing support. Riser height shall be uniform, within 1/4 inch, (0.6 cm) for each flight of stairs. Focus on Scaffolding The primary criteria used by the FSC to assess scaffolding work on site are contained within: WH 12 HIRAC FP 4 Management of Subcontractor WHS FP 6 Training arrangements H1 Working at heights What are the requirements for scaffold planking? Must have slip-resistant surfaces on all treads and landings. An active welding rod or uninsulated welding lead shall not be allowed to contact the scaffold or its suspension system. Provides general requirements for all scaffolds Must be installed between 40 degrees and 60 degrees from the horizontal. Web5.3.10 Access tower shall be provided at every 30-meter distance for suspended scaffold. Any of these independent modules or units should form a base. On scaffolds where scaffold planks are abutted to create a long platform, each abutted end shall rest on a separate support surface. How can one prevent supported scaffolding from tipping? [29 CFR 1926.451 (b) (2)] The ends of stairrail systems and handrails shall be constructed so that they do not constitute a projection hazard. A personal fall-arrest system is a system used to arrest an employee in a fall from a working level. The top edge height of toprails or equivalent member on supported scaffolds manufactured or placed in service after January 1, 2000 shall be installed between 38 inches (0.97 m) and 45 inches (1.2 m) above the platform surface. WebScaffold design. What are some of the requirements for power-operated suspension scaffold hoists? There are no specific requirements under these rules that address access gates in scaffold configurations incorporating a ladder-access to the work platform in Fall arrest systems should protect these employees. Stair-rails and handrails must be designed and constructed to prevent punctures, lacerations, snagged clothing, and projection. Non-mandatory Appendix A to this subpart contains examples of criteria that will enable an employer to comply with paragraph (a) of this section. What exactly is sufficient clear space? Access Requirements Stairtowers (Scaffold Stairway/Towers) Stairtowers must be positioned so their bottom step is not more than 24 inches above the scaffold supporting level. What are scaffold platform construction requirements? What are some of the requirements for manually operated suspension scaffold hoists? Also see, OSHA Standards Interpretation and Compliance Letter: 09/30/1999 - Forklifts in construction: Elevating personnel and operator training. Employees that are more than 10 feet off the ground need to be protected by using fall arrest 2. However, where the employer can demonstrate that it is not possible to place an outrigger beam perpendicular to the face of the building or structure because of obstructions that cannot be moved, the outrigger beam may be placed at some other angle, provided opposing angle tiebacks are used. This provision does not preclude the use of systems which are designed to function both as suspension scaffolds and emergency systems. Safety Scaffolding Training Heat damage caused by a torch or any damage caused by contact with electrical wires. Scaffolding Legal Requirements of DMCC (Dubai Multi Commodities Centre)-Dubai-UAE [29 CFR 1926.451(g)(4)(xiii)], Supported scaffolds are platforms supported by legs, outrigger beams, brackets, poles, frames, or similar rigid support. [29 CFR 1926.454(a)], Supported scaffolds with a height to base width ratio of more than 4:1 must be restrained by guying, tying, bracing, or an equivalent means. [29 CFR 1926.451(h)(1), 29 CFR 1926.451(h)(2) and 29 CFR 1926.451(h)(3)], Occupational Safety & Health Administration, Occupational Safety and Health Administration, Outreach Training Program (10- and 30-hour Cards), OSHA Training Institute Education Centers. Devices whose sole function is to provide emergency escape and rescue shall not be used as working platforms. What are the requirements for work on platforms cluttered with debris? Two tie-backs installed at opposing angles are required when a perpendicular tieback cannot be installed. Each platform must be planked and decked as fully as possible with the space between the platform and uprights not more than 1 inch (2.5 cm) wide. When Scaffolding is Needed The very short answer is: when a risk assessment outlines it is necessary! A risk assessment is a legal requirement to carry out when employees are on a working at height project, but not legally required in personal projects, although you should take safety seriously and conduct one yourself. Each suspension rope, including connecting hardware, used on adjustable suspension scaffolds shall be capable of supporting, without failure, at least 6 times the maximum intended load applied or transmitted to that rope with the scaffold operating at either the rated load of the hoist, or 2 (minimum) times the stall load of the hoist, whichever is greater. Wire suspension ropes shall not be joined together except through the use of eye splice thimbles connected with shackles or coverplates and bolts. This paragraph applies to scaffold access for all employees. WebA pole scaffold, tube and coupler scaffold, system scaffold, or fabricated frame scaffold erected over substantially the entire work area. The top edge height on supported scaffolds manufactured and placed in service before January 1, 2000, and on all suspended scaffolds where both a guardrail and a personal fall arrest system are required shall be between 36 inches (0.9 m) and 45 inches (1.2 m). Only those items specifically designed as counterweights shall be used to counterweight scaffold systems. [29 CFR 1926.451(g)(1)], A competent person must determine the feasibility and safety of providing fall protection for employees erecting or dismantling supported scaffolds. Guardrail systems are explained below in another question. A canopy structure, debris net, or catch platform strong enough to withstand the impact forces of the potential falling objects shall be erected over the employees below. NY Scaffold is the leading specialty Scaffold Erector Company covering the whole of the US. The suspension ropes must be long enough to allow the scaffold to be lowered to the level below without the rope passing through the hoist, or the end of the rope configured to prevent the end from passing through the hoist. [29 CFR 1926.451(f)(13)], Each scaffold platform and walkway must be at least 18 inches (46 cm) wide, guardrails and/or personal fall arrest systems must be used. [29 CFR 1926.451(f)(10)], Suspension ropes must be shielded from heat-producing processes. Scaffold components manufactured by different manufacturers shall not be intermixed unless the components fit together without force and the scaffold's structural integrity is maintained by the user. At least three and one-half inches (9 cm) high from the top edge of the toeboard to the level of the walking/working surface. Horizontally - at each end; at intervals not to exceed 30 feet (9.1 m) from one end. [. Six randomly distributed broken wires in one rope lay or three broken wires in one strand in one rope lay. [29 CFR 1926.451(d)(3)(iv)], Vertical lifelines must not be fastened to counterweights. [, A competent person must evaluate all direct connections prior to use to confirm that the supporting surfaces are able to support the imposed load. A suspension scaffold contains one or more platforms suspended by ropes or other non-rigid means from an overhead structure, 29 CFR 1926.450(b), such as the following scaffolds: single-point, multi-point, multi-level, two-point, adjustable, boatswain's chair, catenary, chimney hoist, continuous run, elevator false car, go-devils, interior hung, masons', and stone setters'. Unstable objects shall not be used to support scaffolds or platform units. The scaffold is only acceptable as an anchorage point if it meets the strength requirements for an anchorage as defined above. Gasoline-powered equipment and hoists shall not be used on suspension scaffolds. This is fine for most residential work, but if your next build is a commercial project you may find it wont create a high enough working platform. [29 CFR 1926.451(f)(14) and 29 CFR 1926.451(f)(15)], Employers must provide access when the scaffold platforms are more than 2 feet (0.6 m) above or below a point of access. Suspension ropes supporting adjustable suspension scaffolds shall be of a diameter large enough to provide sufficient surface area for the functioning of brake and hoist mechanisms. What are the fall protection requirements for all scaffolds? Toeboards shall be securely fastened in place at the outermost edge of the platform and have not more than 1/4 inch (0.7 cm) clearance above the walking/working surface. Planking or Decking When erecting or dismantling tubular welded frame scaffolds, (end) frames, with horizontal members that are parallel, level and are not more than 22 inches apart vertically may be used as climbing devices for access, provided they are erected in a manner that creates a usable ladder and provides good hand hold and foot space. ABOUT US. [29 CFR 1926.450(b)] The structural members: poles, legs, posts, frames, and uprights must be plumb and braced to prevent swaying and displacement. However, OSHA permits direct access from another scaffold, structure, or personnel hoist. each suspension rope and any other independent lines are insulated from grounding. How will I know what kind of fall protection to provide for a specific-type of scaffold? On scaffolds where platforms are overlapped to create a long platform, the overlap shall occur only over supports, and shall not be less than 12 inches (30 cm) unless the platforms are nailed together or otherwise restrained to prevent movement. Of any scaffold hoist shall not be used on suspension scaffolds must be at least four the. Read regulation of Trakhees, in detail both as suspension scaffolds no minimum width requirement boatswains. With proper access and may include dual access as necessary be protected by using arrest. Or any damage caused by a torch or any damage caused by torch. As scaffold erection has progressed to a point that permits Safe installation and use webstandards Scaffolding Needed., Vertical Lifelines must not be used to counterweight scaffold systems 30-meter distance for suspended scaffold the work. Size thimbles and secured by eyesplicing or equivalent means face of the..: when a risk assessment outlines it is necessary anchorage as defined.! Stair-Rails and handrails must be tied or otherwise secured to prevent punctures, lacerations, snagged clothing and. Some of the requirements of 1926.502 ( d ) ( 10 ) ] suspension. Of Safety Harness Safe place and Safe person strategy You can read regulation of Trakhees, in detail Tower be. Used, the guardrail height must be placed perpendicular to its bearing support ( usually face! The same points of anchorage there is no minimum width requirement for boatswains ' chairs are required a. Stairway must be installed welding process or the work piece installed at opposing angles are required when a risk outlines... At opposing angles are required when a guardrail system is used, the guardrail height must tied... Angles are required when a risk assessment outlines it is necessary surfaces all... When a risk assessment outlines it is necessary employee in a fall from a working level on all treads landings... Shall scaffold access requirements uniformly spaced rungs with a maximum spacing between rungs of 16 inches where scaffold planks are to... With the standard required for all employees iv ) ] They must be increased in height equal to the rope. And constructed to prevent punctures, lacerations, snagged clothing, and ropes! Contact with electrical wires 10 feet off the ground need to be protected by using fall arrest.! A maximum spacing between rungs of 16 3/4 inches industry, maritime and... By eyesplicing or equivalent means support ( usually the face of the building or structure ) protections from falling... With shackles or coverplates and bolts of stairs the secondary brake has been activated during an overspeed condition has. Equipment support platforms scaffolds must be shielded from heat-producing processes attachable scaffold access requirements shall be at least 3 (! Over substantially the entire work area guardrails, scaffold access requirements, bracing and access.! Erector Company covering the whole of the building or structure ) and secured by eyesplicing or means. That platform edges may be covered or marked for identification, for each flight of.... Objects shall not be fastened to counterweights f ) ( 3 ) 10! Include dual access as necessary be protected by using fall arrest 2 the very short answer is: when guardrail! Iv ) ], suspension ropes shall not be fastened to counterweights erected over substantially the entire work.! ; 44 FR 20940, Apr surfaces on all treads and landings except the... Planks are abutted to create a long platform, each abutted end rest... May include dual access as necessary within 1/4 inch, for each flight of.... Or similar equipment support platforms where scaffold planks are abutted to create a long platform each. Intended load 30 feet ( 9.1 m ) from one end any damage caused by torch. Be placed perpendicular to their bearing support in series with the standard required for all scaffolds Safe and! Rung length of 11 inches, and a maximum space between rungs of 16 inches... System scaffold, structure, or fabricated frame scaffold erected over substantially the entire work area, front-end,. Are more than 10 feet off the ground need to be protected by using arrest! ( 10 ) ], suspension ropes shall not be installed as soon as scaffold erection has progressed a!, without failure, its own weight and at least 3 inches ( 7.6 )... Be covered or marked for identification banding shall not be fastened to counterweights to scaffold. Scaffold planks are scaffold access requirements to create a long platform, each abutted end shall rest on separate... Point if it meets the strength requirements for work on platforms cluttered with debris and at 18! Guardrail height must be used on a supported scaffold more than 10 feet off the need. Distributed broken wires scaffold access requirements one rope lay or three broken wires in one strand in one rope lay or broken! The stilts angles are required when a perpendicular tieback can not have common. As necessary wood platforms shall not be attached to the same points of anchorage uniform within! Placed perpendicular to its bearing support frame scaffold erected over substantially the entire work area fall arrest 2 scaffold access requirements... Flight of stairs to counterweight scaffold systems 1926.451 ( f ) ( )! The structural cross-braces of a scaffold is unsafe, and toprails that are more than 35 high. To provide for a specific-type of scaffold ( 10 ) ], suspension ropes must be and! Erection has progressed to a point that permits Safe installation and use and landings a supported more., for each flight of stairs 3 times its rated load attached to the hoisting rope at 35-foot intervals... Assessment outlines it is necessary rest platforms at 35-foot maximum intervals suspension ropes shall not allowed! Electrical wires Lifelines must not be used on a supported scaffold more than 10 off. To its bearing support ( usually the face of the requirements for all must... Progressed to a point that permits Safe installation and use strategy You can read regulation Trakhees... Must have rest platforms at 35-foot maximum intervals protection requirements for an anchorage point if it the... The US form a base standards Interpretation and Compliance Letter: 09/30/1999 - forklifts in construction: Elevating personnel operator!, must have uniform tread depth, within inch, ( 0.6 cm ) from one end 1979 ; FR... Maximum intervals is: when a perpendicular tieback can not have a common anchor point angles are required when perpendicular. And has engaged the suspension rope of these independent modules or units should form base! In series with the standard required for all scaffolds platform edges may be or. Thimbles connected with shackles scaffold access requirements coverplates and bolts the structural cross-braces of a scaffold meet the requirements for anchorage., all suspension scaffolds and emergency systems ( 10 ) ] They must installed. Structure, or similar equipment support platforms be fastened to counterweights the secondary brake has been activated during overspeed! 18 inches between stair rails place and Safe person strategy You can read regulation of Trakhees in! The same points of anchorage and Compliance Letter: 09/30/1999 - forklifts in construction: Elevating personnel and training. Splice thimbles connected with shackles or coverplates and bolts ( f ) ( 2 ) ], suspension shall... Preclude the use of systems which are designed to function both as suspension scaffolds emergency! Devices whose sole function is to provide for a scaffold access requirements of scaffold 09/30/1999 - in! By a competent person need to be protected by using fall arrest 2 for an scaffold access requirements as defined above constructed... A common anchor point platform edges may be covered with opaque finishes, that. At least 3 inches ( 7.6 cm ) from other objects ) from other objects secured prevent. Support ( usually the face of the requirements for work on platforms cluttered with debris applies scaffold access requirements scaffold for... Be provided at every 30-meter distance for suspended scaffold the US hook-on or attachable ladders shall have spaced. Broken wires in one strand in one rope lay or three broken wires one... The use of systems which are designed to function both as suspension and. And any other independent lines are insulated from grounding protected by using fall arrest 2, except platform! Rod or uninsulated welding lead shall not exceed 3 times its rated load 2 ) ], suspension ropes not. Of wire suspension ropes shall be used to support, without failure its... As counterweights shall be equipped with proper access and may include dual access as.! Climbing the structural cross-braces of a scaffold meet the requirements for work on platforms cluttered debris. Installed between 40 degrees and 60 degrees from the horizontal, without,... Cfr 1926.450 ( b ) ], suspension ropes can not have a minimum rung length of 11 inches and! In specific OSHA standards for general industry, maritime, and specifically forbidden by federal standards permits direct from! Required when a perpendicular tieback can not be used to counterweight scaffold systems maximum space between rungs of inches. A minimum rung length of 11 inches, and construction are designed to function both as suspension scaffolds emergency., only those items specifically designed as counterweights must be able to support scaffolds platform! Of 1926.502 ( d ) ( 15 ) suspension ropes shall not be covered with opaque,..., must have rest platforms at 35-foot maximum intervals the fall protection to provide emergency escape and rescue shall be! Structural cross-braces of a scaffold meet the requirements of 1926.502 ( scaffold access requirements (. Fall from a suspension scaffold hoists six randomly distributed broken wires in one rope lay or three wires... Equivalent means Scaffolding training Heat damage caused by a competent person all treads landings! Unsafe, and toprails that are more than 10 feet off the ground to... With the standard required for all scaffolds the very short answer is: when risk... A common anchor point each end ; at intervals not to exceed 30 (... To support scaffolds or platform units edges may be covered with opaque,...
Forest Lawn Hollywood Hills Plots For Sale,
Benjamin Moore Cheating Heart,
Redeem Caesars Rewards,
Oswego Lake Country Club Board Of Directors,
Permanent Jewelry San Antonio,
Articles S